Oil & Gas
 

Case Study: Air Products TV2 Project

The project is to provide services to supply the Air Products ‘Tees Valley 2’ Energy from Waste Plant located on Teesside, UK. The Nortech scope was as follows:

     · New 10” oxygen pipeline routed outside of the site boundary for 3.5km. The route followed an existing pipe corridor but was designed to be supported on new foundations.
     · The new line was designed using Caesar II pipe stressing software.
     · 5 No. existing pipe bridges were checked for the increased loading in areas where the pipe crossed over existing obstructions.
     · Designs were undertaken for remedial strengthening of 2 of the bridges that could not currently accommodate the increased loading.
     · A new low level pipe bridge 250m long running between the existing TV1 and new TV2 facility was designed with the capability of installing a solid waste conveyor at a later date.
     · New services culverts were detailed to maintain access routes.
     · New services culverts were detailed to maintain access routes.

 

 

 

 